Heathrow Airport Terminal 2

20th October 2022

Heathrow Airport’s new Terminal Two has been linked in to the existing energy centres by Durotan using pre-insulated steel pipes ranging up to 800mm diameter within a 1000mm outer casing.

These are among the largest steel pre-insulated pipes installed in the UK and were laid in areas congested with other services, often at night and in a high security airside environment as well as adjacent to busy roads in public areas.

The project was carried out safely and within budget.